Revitalizing Stoney Creek Apartments with Expert Interior Painting and Building Repairs
Structural Repairs:
The restoration process began with essential structural work, including the removal and replacement of compromised framing, oriented strand board (OSB) subflooring, insulation, and drywall. These repairs were critical to restoring the unit’s structural integrity and creating a safe foundation for subsequent phases of construction.
Mechanical & Utility Replacement:
All mechanical systems required full replacement due to damage. This involved the coordination and installation of new electrical wiring, HVAC components, and plumbing systems—ensuring that the unit met current building codes and operated safely and efficiently.
Interior Finishes:
To restore functionality and aesthetics, the interior was outfitted with new flooring, cabinetry, doors, appliances, lighting fixtures, and durable quartz countertops. These upgrades not only replaced what was lost but also enhanced the overall value and appeal of the unit.
Specialty Priming & Painting:
To address lingering smoke damage, a comprehensive shellac-based primer was applied throughout the unit to seal in odors before a complete repaint. This step was crucial to achieving a fresh, clean interior environment.
Bathroom Renovation:
The bathroom was fully renovated with the installation of a new bathtub, wall surround, and updated fixtures, delivering a modern, fully functional space.
Safety Upgrades:
As part of the restoration, new smoke detectors and carbon monoxide detectors were installed throughout the unit to ensure compliance with current safety standards and provide peace of mind for future occupants.
Permit & Inspection Delays:
Due to the extent of the damage, obtaining necessary permits and passing required inspections demanded close collaboration with local building authorities. This added complexity to the timeline, resulting in some delays throughout the permitting and approval process.
Demolition Logistics:
During demolition, commercial dumpsters were brought on-site to facilitate the safe and efficient removal of all fire-damaged materials. Specialized equipment and careful planning were essential to maintaining site cleanliness and project flow.