Scope of Work
Our objective was to deliver a professional, durable finish on walls, door frames, and new cove base while meeting a tight one-week schedule.
Timeline – One Week
Surface Preparation: The project began with the removal of old wallpaper followed by meticulous mudding, prepping, and priming of the walls to ensure optimal paint adhesion.
Cove Base Replacement: We removed the outdated cove base and installed a new one, ensuring a seamless transition between surfaces.
Epoxy Painting: High-quality epoxy paints were applied to the walls, door frames, and new cove base, resulting in a robust, long-lasting finish ideal for a professional environment.
The project was completed on time and within the one-week timeframe, delivering a refreshed lab room with a sleek, durable epoxy finish. The client was highly satisfied with the results, which have enhanced both the aesthetic appeal and functionality of their professional office space.